NESPAK to design roads in Oman

National Engineering Services Pakistan (PVT) Limited has been awarded a consultancy services contract for design of a Main highway/expressway connecting Thumrait Interchange with Mubaila Interchange on the Muscat expressway. As Consultants, NESPAK will design major components of the project comprising a dual carriageway main road (25 km), dual carriageway link road (5km), service roads (10 km), five interchanges, five bridges, six vehicular underpasses/overpasses and two pedestrian underpasses/overpasses. Conceived as all-weather roads, the arteries will be designed along with all necessary drainage structures, including the provision of culverts and wadi bridges. The deadline for the completion of design is in 8 months.

In addition to this the Ministry of Transport and Communication, Oman has awarded the construction supervision project of road connecting al Wajaja (Wilayat Al Shinas) with Al Fai (wilayat Al Mahdha) to NESPAK.
Earlier, Special Economic Zone Authority at Duqm- SEZAD (Free zone) awarded design of a Service Road Project at Aman District in Duqm, Oman. NESPAK is also providing construction supervision services for water supply schemes in wilayat Nakhal under Public Authority for electricity and water. MD NESPAK Dr. Tahir Masood congratulated the concerned staff on these achievements.

In the Sultanate of Oman, NESPAK started its operations in the year 1979 and has been providing consultancy services to various government ministries and departments for the last 39 years. The major fields of operations have been major roads, highways, water supply/sewerage schemes and dams.